Home/To the Main Page Search/Search E-Mail
                       
FLNR ACCELERATOR COMPLEXES

  • U400 - Accelerator complex based on U400 isochronous cyclotron was put into operation in 1979. U400 accelerator is Laboratory's basic setup for synthesis of new elements.

  • U400M - Accelerator complex based on U400M isochronous cyclotron was put into operation in 1993. In 2002 this cyclotron was included in DRIBs accelerator complex designed for production of radioactive ion beams.

  • DC280 - Creation of SHE factory based on the high-intensity universal DC-280 cyclotron (A ≤ 238, E ≤ 10 MeV·A, I ≤ 20 pµA) in a new separate experimental building is a part of the DRIBs-III project according to the Seven-Year Plan for the Development of JINR 2010-2016 approved by the Committee of Plenipotentiaries of the Governments of the JINR Member States (CPP) in November 2009.

  • DRIBs - DRIBs-I accelerator complex (130m long) is designed for production of radioactive ion beams and combines constructively U400 and U400M cyclotrons. Was put into operation in 2002.

  • U200 - Accelerator complex based on U200 isochronous cyclotron was put into operation in 1968. At present U200 cyclotron is used for production of ultraclean radioisotopes for ecology and nuclear medicine.

  • MT-25 - Microtron electron accelerator was put into operation in 1973 (MT-17). It was totally upgraded in 1980 (MT-22) and in 1986 (MT-25). This microtron is used for study and production of ultraclean radioisotopes.

  • DC-40 (IC-100) - Cyclotron complex is the full-scale upgrade of IC-100 cycle implanter. Designed for high technology and applied research.

  • Special developments



Boris Nikolaevich Gikal
    Contact person:

    Gikal Boris Nikolaevich
    Head of the accelerator department

    Telephone: (7 49621) 6 44 15

    Fax: (7 49621) 6 50 83

    E-mail : gikal@jinr.ru