  • Creation of SHE factory based on the high-intensity universal DC-280 cyclotron (A ≤ 238, E ≤ 10 MeV·A, I ≤ 20 pµA) in a new separate experimental building is a part of the DRIBs-III project according to the Seven-Year Plan for the Development of JINR 2010-2016 approved by the Committee of Plenipotentiaries of the Governments of the JINR Member States (CPP) in November 2009.

  • The SuperHeavy Element Factory will increase the overall production of super-heavy nuclei by two orders of magnitude with respect to presently achieved rates. This will enable the studies of nuclear /atomic structure of heaviest atoms and open the door to the discoveries of new elements above Z=118 and of isotopes closer to the predicted shell closure at N=184.

  • DC-280 cyclotron, a stand-alone SHE factory

    Click to enlarge

  • DC-280: beam Intensity from 18 GHz ECR source, efficiency of capture and acceleration and ion beam intensity
    (4÷7 the MeV/nucleon) on targets of physical installations.

    Ion Ion charge Beam Intensity from 18
    GHz ECR
    Efficiency of capture and acceleration Beam intensity of (4÷7) MeV/nucl. ions on targets, pps
    eμA pps
    20Ne 3 150 3·1014 30% 1·1014
    40Ar 7 300 3·1014 30% 1·1014
    48Ca 8 150 1·1014 50% 5·1013
    50Ti 8/9 75 5·1013 50% 2,5·1013
    54Cr 9 125 8·1013 50% 4·1013
    58Fe 9/10 125 8·1013 50% 4·1013

    64Ni

    10/11

    125

    8·1013

    50%

    4·1013

    70Zn 11/12 100 5·1013 50% 2,5·1013

    76Ge

    12/13

    50

    2·1013

    50%

    1·1013

    86Kr 14/15 150 6·1013 50% 3·1013

    96Zr

    16

    10

    4·1012

    60%

    2,5·1012

    100Mo 16/17 10 3·1012 60% 2·1012

    124Sn

    20/21

    10

    3·1012

    60%

    2·1012

    136Xe 22/23 150 4·1013 50% 2·1013

    150Nd

    25

    ?

    60%

    1·1012(?)

    192Os 32 5 1·1012 60% 6·1011

    208Pb

    34/35

    15

    2·1012

    60%

    1·1012

    209Bi 34/35 15 2,2·1012 60% 1·1012

    238U

    39/40

    1

    1,5·1011

    60%

    1·1011

  • SHE Factory Project progress

  • Computer model of SHE Factory building


  • SHE Factory building construction site Webcam.